Back to [[Information about iron]] | Back to [[Information about iron]] | ||
+ | |||
+ | ;1. Solar integration | ||
+ | |||
+ | No solar plant has been built yet. The first step was to find possibilities for heat-recovery and energy efficiency. | ||
+ | |||
+ | |||
+ | ;2. Industry Sector | ||
+ | |||
+ | (Surface) treatment of metals | ||
+ | |||
+ | |||
+ | ;3. Industrial application | ||
+ | |||
+ | Solar application: water heating for the black-finishing baths and maybe for heating the production halls | ||
+ | |||
+ | |||
+ | ;4. Process description | ||
+ | |||
+ | * Process flowsheet: | ||
+ | |||
+ | |||
+ | [[Image:Process flowsheet-Eberhard (Austria).jpg]] | ||
+ | |||
+ | |||
+ | * Processes: | ||
+ | |||
+ | ''Black finishing:'' | ||
+ | |||
+ | |||
+ | [[Image:Black finishing.jpg]] | ||
+ | |||
+ | |||
+ | ;5. Energy flows and temperature ranges | ||
+ | |||
+ | * Main heat supply system and fuel: | ||
+ | |||
+ | ::Main fuels: oil & electrical energy | ||
+ | |||
+ | ::Total electrical energy consumption: 80.000 – 100.000 kWh/a Electrical power: 250 – 270 kW | ||
+ | |||
+ | ::Total oil consumption: 103 litres/day 2006: 38.205 litres, heating value: 10 kWh/l fuel heat capacity: 382.050 kWh | ||
+ | |||
+ | ::Thermal energy demand for black-finishing bath: 10.500 – 21.000 kWh (not exactly known) | ||
+ | |||
+ | ::Connection power for oil-heating: 140.000 kWh Heating demand that could be covered by heat-recovery: 420.000 kWh | ||
+ | |||
+ | |||
+ | * Energy consumption (Sankey): | ||
+ | |||
+ | |||
+ | [[Image:Energy consumption-Eberhard (Austria).jpg]] | ||
+ | |||
+ | |||
+ | * Temperature ranges and other parameters: | ||
+ | |||
+ | |||
+ | [[Image:Temperature ranges and other parameters-Eberhard (Austria).jpg]] | ||
+ | |||
+ | |||
+ | ;6. Solar Thermal Plant | ||
+ | |||
+ | * Used scheme: No information available. | ||
+ | |||
+ | Description: | ||
+ | |||
+ | The solar energy is used for direct after-heating of the black-finishing baths, because water-baths at low- and middle-temperature levels are ideal for integrating solar process heat. To integrate such a system, the plant engineering would have to be changed. | ||
+ | |||
+ | |||
+ | * Performance of the planned solar plant: | ||
+ | |||
+ | A solar plant for providing the required 21.000 kWh with 30% solar ratio has to have an area of 20 m² and will produce 7000 kWh/a. These numbers are not calculated, but are only experience-data. | ||
+ | |||
+ | |||
+ | * Pictures of the built solar system: | ||
+ | |||
+ | No information available. | ||
+ | |||
+ | |||
+ | ;7. Energy savings | ||
+ | |||
+ | * Pinch analysis results: | ||
+ | |||
+ | No information is available. | ||
+ | |||
+ | |||
+ | * Energy savings: | ||
+ | |||
+ | No information is available. | ||
+ | |||
+ | |||
+ | ;8. Economic evaluation | ||
+ | |||
+ | * Economic parameters of the built solar system: | ||
+ | |||
+ | Investing costs: ~ 10.000 € Promotion: 30% | ||
Revision as of 11:58, 20 October 2010
Back to EFFICIENCY FINDER FOR METAL INDUSTRY
Back to Information about iron
- 1. Solar integration
No solar plant has been built yet. The first step was to find possibilities for heat-recovery and energy efficiency.
- 2. Industry Sector
(Surface) treatment of metals
- 3. Industrial application
Solar application: water heating for the black-finishing baths and maybe for heating the production halls
- 4. Process description
- Process flowsheet:
- Processes:
Black finishing:
- 5. Energy flows and temperature ranges
- Main heat supply system and fuel:
- Main fuels: oil & electrical energy
- Total electrical energy consumption: 80.000 – 100.000 kWh/a Electrical power: 250 – 270 kW
- Total oil consumption: 103 litres/day 2006: 38.205 litres, heating value: 10 kWh/l fuel heat capacity: 382.050 kWh
- Thermal energy demand for black-finishing bath: 10.500 – 21.000 kWh (not exactly known)
- Connection power for oil-heating: 140.000 kWh Heating demand that could be covered by heat-recovery: 420.000 kWh
- Energy consumption (Sankey):
- Temperature ranges and other parameters:
- 6. Solar Thermal Plant
- Used scheme: No information available.
Description:
The solar energy is used for direct after-heating of the black-finishing baths, because water-baths at low- and middle-temperature levels are ideal for integrating solar process heat. To integrate such a system, the plant engineering would have to be changed.
- Performance of the planned solar plant:
A solar plant for providing the required 21.000 kWh with 30% solar ratio has to have an area of 20 m² and will produce 7000 kWh/a. These numbers are not calculated, but are only experience-data.
- Pictures of the built solar system:
No information available.
- 7. Energy savings
- Pinch analysis results:
No information is available.
- Energy savings:
No information is available.
- 8. Economic evaluation
- Economic parameters of the built solar system:
Investing costs: ~ 10.000 € Promotion: 30%