Energy efficiency in baby food
From Efficiency Finder
PRODUCTION PROCESSES
Thermal energy
Heat generation
low-cost / short term opportunities | |||||
---|---|---|---|---|---|
Energy Saving Opportunity | Action to Check | ||||
1. Reduce excess combustion air to minimum | 1. CO2/O2 measurement | ||||
2. Maximise completeness of combustion | 2. Soot/CO measurement | ||||
3. Maintain boiler cleanliness (soot/scale) | 3. Monitor for rise in flue gas temperature | ||||
4. Repair (replace) boiler insulation | 4. Periodic inspection of boiler insulation condition. | ||||
5. Insulate feedwater tank – cover tank | 5. Check possible feedwater temperature losses | ||||
6. Insulate condensate return lines | 6. Check possible heat loss from condensate return lines. | ||||
7. Optimise quality of make-up water and feedwater | 7. Monitor quality of make-up water and feedwater: hardness, acidity, O2. | ||||
8. Minimise blowdown | 8a. Monitor concentration of dissolved solids in boiler water.
8b. Improve blowdown controls | ||||
9. Maintain nozzles, grates, fuel supply pressure/temperature at manufacturers’ specifications | 9a. Ensure specifications are available and in use.
9b. Regular check and resetting/maintenance. | ||||
10. Maximise combustion air temperature | 10. Draw air from highest point in boilerhouse. | ||||
11. Reduce steam pressure where it exceed system/process requirements. | 11. Check system/process needs; adjust controls. | ||||
12. Use duct for intake of warmer combustion air | 12. Install duct from combustion air intake to higher parts of room. | ||||
13. Install an automated gas leakage detector. | - | ||||
14. Repair leaks in steam pipework. | - |
Higher cost / longer term opportunities | |||||
---|---|---|---|---|---|
Energy Saving Opportunity | Action to Check | ||||
1. For rapidly varying demand, convert one or more boilers to live accumulator (buffer tank). | 1. Monitor/evaluate demand change patterns. | ||||
2. Alter controls to “High-Low-Off” or “modulating-Low-Off” | 2. Monitor/evaluate demand change patterns. | ||||
3. Install flash steam heat recovery | 3. Consider in large capacity situations with high (continuous/frequent) blowdown. | ||||
4. Improve combustion controls. | 4a. Provide adequate heat input to meet demand.
4b. Minimise fuel/pollution. 4c. Protect personnel/equipment. | ||||
5. Waste heat recovery | 5a. Economiser
5b. Air heater (recuperator)? | ||||
6. Install boiler blowdown heat recovery. | 6. Consider in large capacity situations with high (continuous/frequent) blowdown. | ||||
7. Use process integration | 7. Couple process units that have significantly different heat requirements (i.e. low-pressure
steam leaving a high-pressure steam consuming production process can be used for a process requiring low-pressure steam). |
Heat Distribution
Low-cost / short term opportunities | |||||
---|---|---|---|---|---|
Energy Saving Opportunity | Action to Check | ||||
1. Repair/replace faulty insulation | 1. Pipework insulation – especially around valves. | ||||
2. Repair inefficient steam traps/drains. valve spindles etc. | 2. Regular checks for leaks throughout the system. | ||||
3. Insert valves to isolate “periodic-use” items in system. | 3. Check system for periodic (e.g. seasonal, nightly) items (e.g. space heaters). | ||||
4. Remove/isolate “dead-legs” and redundant Pipework. | 4. Check for dead-legs and redundant piping. |
Higher cost / longer term opportunities | |||||
---|---|---|---|---|---|
Energy Saving Opportunity | Action to Check | ||||
1. Replace steam traps/drains with more efficient designs. | 1. Monitor efficiency of, and heat losses from existing traps. | ||||
2. Replace or increase insulation | 2. Check existing insulation; estimate heat losses in system. | ||||
3. Maximise condensate returns. | 3. Measure “discarded” heat from condensate. | ||||
4. Redesign system to minimise pipe runs. | - | ||||
5. Generation pressure reduction. | - |
Heat Utilisation
Process
Energy Saving Opportunity |
1. Plant insulation |
2.Local burner efficiency |
3. Maximise heat transfer rate |
4. Improve controls (e.g. thermostats) |
5. Consider alternative energy source |
6. Ensure plant at high load factor |
7. Eliminate uneconomic “hot standby” periods |
8. Recycle waste heat to process |
8. Recover heat, for use elsewhere |
9. Train all staff to operate manual controls and to watch for energy saving opportunities. |
Space heating
Low-cost / short term opportunities | |||||
---|---|---|---|---|---|
Energy Saving Opportunity | |||||
1. Use heat only when area is occupied | |||||
2. Set thermostats to minimum for comfort | |||||
3. Minimise loss of hot air | |||||
4. Clean and effective heaters | |||||
5. Maintain pipe insulation in unheated areas | |||||
6. Check condensate traps | |||||
7. Vent air from hot water systems | |||||
8. Time switches | |||||
9. Manual controls where appropriate |
Higher cost / longer term opportunities | |||||
---|---|---|---|---|---|
Energy Saving Opportunity | |||||
1. Install more/more efficient thermostats | |||||
2. Use motorised valves to divide building into different zones | |||||
3. Air curtains | |||||
4. Change energy source | |||||
5. Change heating system – where:
Insulation Ventilation Use Good High Radiant Heat Poor Low Convective Heat | |||||
6. Improve building insulation |