Solar application for drying

From Efficiency Finder
Revision as of 10:39, 6 August 2013 by Carina97 (Talk | contribs) (Created page with "Back to EFFICIENCY FINDER '''1. Systematics of SystemConcepts''' *;Suitable schemes for drying: ::1. Generic system –NSO - Air : Image:solar drying.jpg LITE...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Back to EFFICIENCY FINDER


1. Systematics of SystemConcepts


  • Suitable schemes for drying


1. Generic system –NSO - Air :

Solar drying.jpg

LITERATURE: “Generic Systems”, 3rd Draft, W.Weiss, D.Jähnig, AEE Intec


2. Generic system –NPO - Air :

Solar drying2.jpg

LITERATURE: “Generic Systems”, 3rd Draft, W.Weiss, D.Jähnig, AEE Intec


3. Generic system –SPOHX – Air :

Solar drying3.jpg

LITERATURE: “Generic Systems”, 3rd Draft, W.Weiss, D.Jähnig, AEE Intec


  • General information


Solar drying4.jpg

LITERATURE: “Generic Systems”, 3rd Draft, W.Weiss, D.Jähnig, AEE Intec


2. Critical issues for solar integration

Drying may require large quantities of heat, when large quantities of material have to be processed. When the produced solar heat is not enough, a boiler in parallel with the solar collector can provide the necessary heat for the process (Joanneum Research). In small production units, when there are long intervals between two operations, the heat storage tank cannot sufficiently store the thermal energy until it’s used. In these cases the surplus of produced heat, during the days of no production, should be used for other processes also if that is possible (Joanneum Research).

help topics


Back to EFFICIENCY FINDER